Projects Reference ListAbout
PROJECT REFERENCES LIST.
Mowe Marine & Offshore has successfully delivered a wide range of marine & offshore systems, packages & solutions to our valued clients across the region and worldwide
■ 1. VALVE, ACTUATOR & VALVE CONTROL SYSTEMS PACKAGES REFERENCE LIST
| COUNTRY | SHIP-OWNER | SHIPYARD | VESSEL TYPE & NAME | CLASS | SYSTEM & SERVICES | Package Details |
|---|---|---|---|---|---|---|
| Malaysia | MISC Berhad | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FSO Abu Cluster Year 2007 |
ABS | Cargo valve & actuator repair and retrofit of Nakakita system, New seats rings, rebuild body with glass flake, painting to offshore specs, Actuators at yard repair are replaced with actuators. Pressure and body test & handling over to yard. | Valve & Actuators repair works |
| Malaysia | Malaysia Vietnam Offshore Terminal(MVOT) | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FSO Orkid Year 2008 |
ABS | Cargo Valve retrofit and overhaul of complete 130 cargo valves. Repair and replacement of Nakakita seals, rings seats, MPI test and glass flake on cargo valves. Added new cargo valves to system with Actuators approx 12 units. | Valve & Repair works |
| Malaysia | Vietnam Offshore Floating Terminal(VOFT) | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FPSO Ruby Year 2009 |
ABS | Emergency Shutdown System - ESD Valve and interface with ICSS on Hydraulic actuator. Ball valve of 16” and open within requirements of 45 seconds. | ESD Valve |
| Malaysia | Vietnam Offshore Floating Terminal(VOFT) | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FPSO Ruby Year 2009 |
ABS | Deck Boxes 4 units for Cargo Valve system - for control of 32 cargo valves interfacing with Emerson ICSS. Deck box included Volume position indicators, manual controls, throttle valves and manifolds. | Partial Valve control system |
| Malaysia | MISC / Petrofac | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FPSO Cendor Phase 2 Year 2009 |
BV | Cargo Valve Control System employing Deck boxes for local control indication with VPI, manifolds and Eex IS solenoid valves to interface with ICSS / Cargo system. | Partial – Valve control system |
| Malaysia | MISC / Petrofac | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FPSO Cendor Phase 2 Year 2009 |
BV | Cargo Valve retrofit and overhaul of complete 98 cargo valves. Repair and replacement of Nakakita seals, rings seats, MPI test and glass flake on cargo valves. Added new cargo valves to system with Actuators. | Valve & Actuators repair |
DOWNLOAD / VIEW ORIGINAL ATTACHMENTS:
■ 2. PIPING, TUBING & FLUSHING WORKS REFERENCE LIST
| COUNTRY | SHIP-OWNER | SHIPYARD | VESSEL TYPE & NAME | CLASS | SYSTEM & SERVICES | Package Details |
|---|---|---|---|---|---|---|
| Malaysia | MISC Berhad | Offshore | South Angsi Year 2006 |
ABS | Hydraulic system design. Piping installation and material supply for the Hydraulic Cargo System. Installation work, purging, flushing and commissioning for 30 days NAS 8. Work done FSO on site without hot works. | Piping works & Flushing |
| Malaysia | SBM Malaysia | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FPSO Kikeh Year 2006 |
ABS | Design, installation and fabrication of Hydraulic system piping and tubing system for FPSO. Designed drawings for approval and production drawings for construction. Work includes pipe & tube pressure testing, purging and flushing to NAS 8. Main Header, Branch & Tee total approx 15000 meters. Added Double pilot check valves and necessary control valves to redesign hydraulic circuit. | Piping works and Flushing |
| Malaysia | MISC Berhad | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FSO Abu Cluster Year 2007 |
ABS | Design, installation and fabrication of Hydraulic system piping and tubing system for FPSO. Designed drawings for approval and production drawings for construction. Work include pipe & tube pressure testing, purging and flushing to NAS 8.Systems include Offloading system, Cargo valve management system and cargo valve skimming system. Total approx 5000 meters. | Piping and Tubing works |
| Malaysia | Malaysia Vietnam Offshore Terminal (MVOT) | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FSO Orkid Year 2008 |
ABS | Design, installation and fabrication of Hydraulic system piping and tubing system for FPSO. Designed drawings for approval and production drawings for construction. Work includes pipe & tube pressure testing, purging and flushing to NAS 8. Main Header, Branch & Tee total approx 4000 meters. | Piping and Tubing works |
DOWNLOAD / VIEW ORIGINAL ATTACHMENTS:
■ 3. CARGO/TANK MANAGEMENT, ESD & FIRE and GAS SYSTEMS REFERENCE LIST
| COUNTRY | SHIP-OWNER | SHIPYARD | VESSEL TYPE & NAME | CLASS | SYSTEM & SERVICES | Package Details |
|---|---|---|---|---|---|---|
| Malaysia | Petronas /MISC | Offshore | South Angsi Year 2006 |
ABS | Cargo Management Control System with modification of existing Console, Mimic and Deck Boxes, Manufacture and supply of the complete hardware and software control package complete with commissioning for 40 valves System in Hazardous zone1. Designed with mid-range Siemens processors, Distributed I/O with Profibus network. | Partial |
| Malaysia | MISC Berhad | Malaysia Marine & Heavy Engineering Sdn Bhd (MMHE) | FSO Abu Cluster Year 2007 |
ABS | Tank Management control system for 17 cargo tanks, draft sensors, HMI interface and control with Allen Bradley ABS approved processor for system interface. Radars with field network on Profibus PA. Existing Nakakita's Cargo Valve mimic and feedback is remapped and displayed on 2 X 19" monitors in new console. Interface and output to Loading computer. Redundancy is designed to be at Nakakita Console and new computerised Cargo System. | Complete - Tank gauging Systems |
DOWNLOAD / VIEW ORIGINAL ATTACHMENTS:
■ 4. SKID PACKAGES, HPU, ACCUMULATORS & AUXILIARY SYSTEMS REFERENCE LIST
| COUNTRY | SHIP-OWNER | SHIPYARD | VESSEL TYPE & NAME | CLASS | SYSTEM & SERVICES | |
|---|---|---|---|---|---|---|
| Malaysia | MISC /Petrofac | Malaysia Marine &Heavy Engineering Sdn Bhd (MMHE) | FPSO Cendor Phase 2 Year 2010 |
BV | Tug Winches for Port and Aft of FPSO vessel. | Winches |
| Malaysia | Murphy | THHE | Permas Field Year 2013 |
ABS | Chemical Injection Skid for Permas field. Include Scale Inhibitor skid package 9 head pumps for both packages. System operating pressure 425 Bar. 10000 PSI system. Total 2 skid packages delivered. | Complete CI Skid |
DOWNLOAD / VIEW ORIGINAL ATTACHMENTS:

